Your drone flies. Now get it built.

Move a flight-tested aircraft into a controlled pilot build by closing DFM, BOM, sourcing, assembly, inspection, test, and first-lot risks around the component blocking your next lot.

Request a pilot-build review
Engineering-grade polymer drone components arranged on a precision fixture.

Capacity, price, lead time, and delivery are confirmed only in writing.

PROTOTYPE TO PILOT / CONTROLLED GATES

Close the path to the first lot.

  1. 01

    Readiness intake

    Name the stalled build, target lot, and release need.

  2. 02

    DFM & BOM review

    Resolve geometry, material, process, part, and source gaps.

  3. 03

    Sourcing plan

    Approve inputs and expose supply and lead-time assumptions.

  4. 04

    Pilot build

    Run the bounded lot with planned work and inspection.

  5. 05

    Inspect, test, release

    Record evidence and release the first-lot basis.

BUILD FIT / THREE ENTRY POINTS

Move the blocked build forward.

Prototype-to-pilot planning, stalled-build recovery, and controlled small-batch work start from the same facts: the current definition, open decisions, and required output.

The review bounds material and process fit, lot scope, sourcing and lead-time assumptions, inspection and test requirements, and the traceability needed for first-lot release.

Entry point
Flight-tested prototype, stalled build, or bounded small-batch component need
Material + process
Reviewed from part geometry, requirements, operating conditions, finish, and approved options
Lot + schedule
Reviewed after setup, sourcing, capacity, inspection and test burden, and the requested window are known
Evidence follows the work package: DFM decisions, BOM and source assumptions, material or lot records, inspection and test results, deviations, and release status. No capacity, price, or lead-time claim is made before written review.

PILOT-BUILD QUOTE INTAKE

Build the four-field quote brief.

No account or upload is required. These fields start the quote form with the facts needed for manufacturing-fit review.

RFQ not ready. Complete all four fields. Continue to quote request

The four-field brief opens the quote form. Only a written response can confirm fit, capacity, price, or timing.

QUOTE + DATA BOUNDARY

Start high-level. Protect the details.

The initial quote request should contain high-level, unclassified business facts only. Keep technical and protected files out until a safe exchange path is agreed.

Start the pilot-build quote