Drone Pilot Build Readiness Scorecard

A drone is ready for pilot-build planning when the current product definition, material basis, build knowledge, inspection, test, and change authority can be made explicit. Use this scorecard to expose the open decisions.

Bring the part, volume, material or process, and deadline. The build desk screens the route before anyone commits capacity or lead time.

EIGHT CONTROL AREAS

Check what is true today.

This tool is a planning aid, not a certification, quote, schedule, or production commitment. The full method and interpretation remain visible without sending an RFQ.

0 / 8Start with the current facts

READ THE RESULT

A score is a conversation starter, not a release decision.

A low score means the first useful output is a gap-closing plan. A higher score means the team can examine whether the controls are detailed and internally consistent.

0 to 2Clarify the production obligation and current baseline.
3 to 5Build a production-risk register before committing the lot.
6 to 8Audit the evidence behind each checked control and plan the pilot gate.

NEXT OUTPUT

Turn the checked boxes into owned decisions.

01

Evidence review

Identify what record supports each “yes,” where the answer is partial, and which assumption still needs an owner.

02

Dependency map

Connect product changes, material decisions, tooling, inspection, test, and approval timing.

03

Pilot gate

Define the minimum basis required before the first controlled lot can begin.