Which configuration?
Name the intended aircraft and known changes. Do not let inventory or a convenient file silently choose the baseline.
BUYER GUIDE / SMALL BATCH
A small batch should do more than create units. It should produce accepted aircraft, expose the real production constraints, and leave the product package more repeatable than it was before the lot began.
Bring the part, volume, material or process, and deadline. The build desk screens the route before anyone commits capacity or lead time.
LOT-PLANNING ANSWER
The job is to bound risk while creating useful output. The lot should test the product baseline, sources, build sequence, tooling, inspection, acceptance, records, and learning loop under controlled conditions.
BEFORE PURCHASE ORDERS
Name the intended aircraft and known changes. Do not let inventory or a convenient file silently choose the baseline.
Identify long-lead exposure, sole-source parts, approved alternates, customer-furnished material, and incoming evidence.
Define the inspections, functional checks, records, and disposition authority that support acceptance.
LOT ARCHITECTURE
QUOTE READINESS
A useful production estimate depends on configuration, quantity, material, process, tooling, inspection, test, records, packaging, schedule assumptions, and the responsibility boundary.
| Input | Question it must answer |
|---|---|
| Design package | What exactly is being built? |
| BOM and source plan | What material is approved and available? |
| Build plan | What work, tools, skills, and hold points apply? |
| Acceptance plan | What inspection and test evidence releases a unit? |
| Lot profile | What quantity, window, learning objective, and follow-on intent shape the work? |